Remediation is beginning this week. Today will be all setup
and preparations with the work starting tomorrow. The work is expected to
take 3 months, though it will possibly extend longer as there was material
added to the area after the estimates were made.
Mika will be temporarily relocating to Emily’s layout
space. Her phone will likely be placed at the volunteer cubicle on the 4th
floor HMRC suite.
There will be no access to the layout space from stacks
doors. This
is critical because access from these doors will damage the partitions they
have set up in the area.
No access to the
elevator entrance to the 2nd floor, except to pick up materials that have
been cleaned and are ready to be reshelved. All other access to the
layout space must be through the
fire exit stairwell.
Also, for now I will need staff working at the reference
desk to facilitate Ann Becker’s access to the layout space. She knows to
come to the desk to ask to be swiped up. But I am working on getting her a
badge so hopefully this won’t last long.
No comments: